Bebo Arch system Multiplate Stren cor Tunnel Liner Export Export Contact us
LATEST NEWS

 

24 hour turn around replacing culvert

18 May 2007

South Lanarkshire County Council called upon ASSET ISS to provide them with a 21m long epoxy coated Multiplate pipe 2.03m diameter, urgently required to replace a damaged culvert. Within 24 hours our product was delivered to site ready for assembly to commence.

< Back to latest news

 



© 2007 ASSET International Telephone: +44 (0)1633 271906 | Useful Links | Latest News | Contact Us | Design Manual | FAQs