Search

MP200 USED ON THE MAJOR ROAD SCHEME PERTH A9 CRIEFF ROAD

Updated: Oct 1, 2018

PERTH A9 CRIEFF ROAD - UNDERPASS STRUCTURE



The underpass provided is part of the Perth Town Lade footway/ cycleway/ equestrian route which support the new B9993 Ruthvenfield Link Road. Original design was a Multiplate Arch sitting on top of the Lade culvert.


During the design process, the underpass’ location moved and is now parallel to, but higher in the embankment than the Lade culvert. With Asset’s value engineering input, a closed ring structure is chosen to eliminate the needs of foundation slabs.


MP200 Multiplate UnderPass, length 58.25m


Asset International Structures

(A Division of Hill & Smith Ltd)

Suite 5 Brecon House

William Brown Close

Llantarnam Industrial Park

Llantarnam, Cwmbran

Torfaen

NP44 3AB

United Kingdom

Hill & Smith PLC Logo 2018.png

Company Trading Name: Hill & Smith Ltd

Company Trading Division: Asset International Structures

Company Registration Details 01270322 

VAT Number GB 369 684 685

Copyright © 2019 Asset International Structures