ASSET BEBO GREEN BRIDGE - A9 DUALLING SCHEME
- asset International Structures Ltd
- 20 hours ago
- 1 min read
LUNCARTY, SCOTLAND
PROJECT OVERVIEW
asset International Structures Ltd developed an elliptical 30m span E30mT asset BEBO arch solution for the A9 Dualling scheme at Luncarty, Scotland. The wide span allowed the structure to be built over an existing watercourse without disturbing the natural streambed, and to also accommodate an access track linking agricultural land on either side of the new highway.
PROBLEM SOLVED
A new road was required over a watercourse (within a green belt area) as part of the Dualling scheme, with the aim to make the route safer and increase capacity. The chosen structure needed to blend into the surrounding landscape not only from an aesthetic point of view, but also from an ESG standpoint.

ESG
asset BEBO Green Bridges have been designed with surrounding wildlife and ecosystems in mind. The E30mT asset BEBO Green Bridge was ultimately chosen due to its slender sections and bevel end finish, reducing social impact and providing connectivity to the surrounding areas of Luncarty.
Comments