top of page

ASSET BEBO GREEN BRIDGE | N17 ROAD, IRELAND

COOLE - IRELAND



PROJECT OVERVIEW

The N17 between Gort and Tuam was opened by the Minister for Transport Shane Ross. The now four-lane highway links Tuam with Gort and progresses on to Shannon airport.


PROBLEM SOLVED

The clearance profile for the new motorway called for a double span asset BEBO Arch Structure – both inner legs of the arches cut down and resting on a support wall between the roadway lanes. The standard asset BEBO E15.5mT fulfilled all the requirements – a beveled end arrangement completed the layout to fit perfectly into the surrounding environment.


ESG

asset’s BEBO arches were designed and installed as the first State’s “bat bridge” allowing bats and mammals to cross safely near Lady Gregory’s home of Coole Park. As well as asset's BEBO arches aesthetic design complimenting the surrounding environment, the arches also aim to ensure that the lesser horseshoe bats will use the safe access to Kiltartan cave and feeding grounds in Coole Garryland.


Mr Ross was one of two Ministers, a Minister of State, a former junior minister, a Senator and a number of councillors at the opening. He described the motorway as a “huge boost” for the western seaboard area.


How can we assist banner

Commentaires


bottom of page