The asset MultiPlate MP200 corrugated steel underpass provides a compliant and durable strengthening solution for Bishopthorpe Bridge, transforming the structure into a fully load‑carrying system.
The Saltford Water Recycling Centre Access Road project included a total of 18 asset MultiPlate corrugated steel buried structures (CSBS). his impressive installation allowed the natural flooding of the river Avon to take place.
Early engagement with consultants was made to specify an asset BEBO precast concrete arch for the North Devon Link Road project. The chosen structure was a 30m span, T94 asset BEBO Arch.
We were approached to design and supply a steel culvert over a watercourse, which would provide the main access track to enable turbine foundations as well as transportation of turbine masts, rotors and blades.
This impressive triple arch system comprises of 2x T17.5 arches, 1x T22.5 arch with bevel ends over a watercourse, plus an additional E24 square-ended asset BEBO concrete arch.