The Saltford Water Recycling Centre Access Road project included a total of 18 asset MultiPlate corrugated steel buried structures (CSBS). his impressive installation allowed the natural flooding of the river Avon to take place.
Early engagement with consultants was made to specify an asset BEBO precast concrete arch for the North Devon Link Road project. The chosen structure was a 30m span, T94 asset BEBO Arch.
We were approached to design and supply a steel culvert over a watercourse, which would provide the main access track to enable turbine foundations as well as transportation of turbine masts, rotors and blades.
This impressive triple arch system comprises of 2x T17.5 arches, 1x T22.5 arch with bevel ends over a watercourse, plus an additional E24 square-ended asset BEBO concrete arch.
The asset FRP Access Steps located over a concrete floodwall at Corporation Road Floodgate, formed part of the flood remediation package at Stephenson Street to protect local businesses and housing.
Salford City Council required rehabilitation of an existing bridge deck along with maintenance to the cycle route access and usage. The chosen solution was to reline the underpass utilising asset MultiPlate MP200.