top of page



Approvals & Certifications
Approvals & Certifications
Clients & Projects
built for future | designed for life
built for future | designed for life
built for future | designed for life
QUARRY EXTENSION SUPPORTED BY ASSET
EAST BLINEY quarry extension




Asset MultiPlate MP200 Pipe Arch length 37.5m was used on this project. The works comprised of the installation of a corrugated steel segmental culvert below School Road required to carry a conveyor for extracted material from an extension to East Bilney Quarry.
bottom of page