top of page

QUARRY EXTENSION SUPPORTED BY ASSET

The works comprised of a corrugated steel segmental culvert below School Road, required to carry a conveyor for extracted material.

asset MultiPlate MP200 Pipe Arch (length 37.5m) was used on this project. The works comprised of the installation of a corrugated steel segmental culvert below School Road required to carry a conveyor for extracted material from an extension to East Bilney Quarry.

bottom of page