top of page
![](https://static.wixstatic.com/media/929dbc_2a45464a97974f669dd84764e2ca04f4~mv2.png/v1/fill/w_336,h_116,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/929dbc_2a45464a97974f669dd84764e2ca04f4~mv2.png)
![](https://static.wixstatic.com/media/929dbc_2a45464a97974f669dd84764e2ca04f4~mv2.png/v1/fill/w_336,h_116,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/929dbc_2a45464a97974f669dd84764e2ca04f4~mv2.png)
![ASSET Products Page Logo S-IT 2018_Sleev](https://static.wixstatic.com/media/929dbc_a68dbedc232641fe8a1309187d630340~mv2.png/v1/crop/x_76,y_0,w_473,h_224/fill/w_240,h_116,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/ASSET%20Products%20Page%20Logo%20S-IT%202018_Sleev.png)
Approvals & Certifications
Approvals & Certifications
Clients & Projects
built for future | designed for life
built for future | designed for life
built for future | designed for life
QUARRY EXTENSION SUPPORTED BY ASSET
The works comprised of a corrugated steel segmental culvert below School Road, required to carry a conveyor for extracted material.
![](https://static.wixstatic.com/media/fa2b02_c2721dca2e9041a0bb65d857f1746b52~mv2.jpg/v1/fill/w_757,h_400,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/M11%20VSoL%20Walls%20-%20MAIN.jpg)
![Steel culvert](https://static.wixstatic.com/media/fa2b02_1fb2c677353743b9af9547c2491f539a~mv2.jpg/v1/fill/w_120,h_120,q_90/fa2b02_1fb2c677353743b9af9547c2491f539a~mv2.jpg)
![Steel culvert](https://static.wixstatic.com/media/fa2b02_c12542f30cff4a479597ac35bc6f6724~mv2.jpg/v1/fill/w_121,h_120,q_90/fa2b02_c12542f30cff4a479597ac35bc6f6724~mv2.jpg)
![Steel culvert](https://static.wixstatic.com/media/fa2b02_be8c960d0f874992ab26813de6ea40e4~mv2.jpg/v1/fill/w_120,h_120,q_90/fa2b02_be8c960d0f874992ab26813de6ea40e4~mv2.jpg)
asset MultiPlate MP200 Pipe Arch (length 37.5m) was used on this project. The works comprised of the installation of a corrugated steel segmental culvert below School Road required to carry a conveyor for extracted material from an extension to East Bilney Quarry.